Skip to main content
  • Careers
  • Contact
  • Forms

Search

Murray River Experience

The Murray River Experience Master Plan (MRE) remains a cornerstone in the strategic development of open spaces along the Murray River and Lake Hume within the Albury Local Government Area. Originating from a community-driven vision in 2007, this comprehensive plan has continually shaped the city’s connection with its natural surroundings.

Complete

Background

The Murray River Experience Master Plan (MRE) remains a cornerstone in the strategic development of open spaces along the Murray River and Lake Hume within the Albury Local Government Area. Originating from a community-driven vision in 2007, this comprehensive plan has continually shaped the city’s connection with its natural surroundings.

Endorsed by Albury City Council in 2007, the MRE identified focal points along the Murray River and Lake Hume which included:

The Wagirra Trail is also a major element of the Murray River Experience Master Plan.  At present a constructed trail links Wonga Wetlands in the west to the Central Albury Riverside Parks and to the Wodonga trail network. The Yindymarra Sculpture Walk features stunning contemporary Aboriginal sculptures along the section of trail between Kremur Street Boat Ramp and Horseshoe Lagoon.

The ultimate aim is to construct a trail to Lake Hume with the short-term priority to connect to Mungabareena Reserve.

Guided by overarching design drivers, the plan aimed to strengthen community ties with the river, enhance accessibility, ensure quality amenities, promote diverse experiences, and improve the river’s health in fostering the Aboriginal community’s connection.

Murray River Experience Master Plan Endorsed

At the Council meeting held on the 11 November 2024, Council endorsed the following Murray River Experience associated master plans

Phase Two Consultation Update

There was significant community interest, with more than 700 submissions received through the consultation process. We are currently reviewing this feedback and preparing a report for Council that will include all the community submissions, describe the key results, identify proposed refinements, and outline proposed next steps for further community consultation. We anticipate presenting this report to Council in the middle of the year.

There was a lot of positive feedback for many of the elements and priorities identified within the draft Murray River Experience Master Plan (Parts A and B) and the draft Lake Hume Reserves Master Plan.

However, there was less support for the draft Noreuil Park Riverbank Rehabilitation Concept Plan, with the community raising several concerns and providing extensive feedback.

Key themes of the feedback included:

  • Too much concrete, which will be hot and will detract from the site.
  • Keep the mature river red gums, as they provide great shade and habitat for wildlife.
  • Keep Noreuil Park natural with the mature trees and grassed areas.
  • Investigate alternative locations for all-abilities river access at low levels.
  • Remove the proposed south-western BBQ area.

Given the above community feedback, we will now develop a revised Noreuil Park foreshore concept plan with alternative options, which we will share with the community for further input and feedback later this year.

Phase Two Consultation

Phase two consultation closed on 5 April 2024. We are currently working through the feedback received. The documents available for reviews as part of this consultation are listed below

  • Part A – Murray River Experience Master Plan Review (Draft)
  • Part B – Central Albury Riverside Parks Master Plan (Draft)
  • Draft Lake Hume Reserves Master Plan
  • Draft Noreuil Park Riverbank Rehabilitation Concept Plan
  • Murray River Experience Master Plan (2007)

More information is available on the Have Your Say webpage.

Status

Complete

Categories

Murray River Experience
Murray River Experience
Murray River Experience
Murray River Experience

Related Projects

Solar Lights on Wagirra Trail

Installation of Solar lights along the Wagirra Trail

Glen Park Sportsfield Lighting Upgrade

The installation four sportsfield light poles and LED lights to increase the lit training area at Glen Park

Ernest Grant Park Play Space

The construction of a district level play space at Ernest Grant Park.

Nail Can Hill Tracks

We’re planning a major investigation into how tracks and trails on Nail Can Hill can be improved and maintained over coming years.

Jelbart Park Sportsground Lighting Upgrade

The installation LED sportsfield lights to enable the sport to play night games and increase the lit training area at Jelbart Park.

Eastern Hill Activation Master Plan

Eastern Hill, east of Central Albury, offers passive recreation like bushwalking, birdwatching, trail running and stunning views from the Eastern Hill Rotary Lookout.

Environmental Streambank Works

We're removing environmental weeds and improving the vegetation along four 100 metre sections of the  Murray River streambank between Union Bridge and the Noreuil Park.

Noreuil Park Foreshore

Essential repair works to the riverbank along the Noreuil Park Foreshore that will address damaged sections of the retaining wall to enhance community safety and stabalise the bank to protect several large River Red Gum trees.

Environmental Streambank Works - Noreuil Park

We're removing environmental weeds and improving the vegetation along the Murray River streambank between Oddies Creek pedestrian bridge and Noreuil Park Foreshore.
OUR
ACKNOWLEDGMENT

AlburyCity acknowledges the Wiradjuri people as the traditional custodians of the land in which we live and work and we pay our respects to Elders past, present and future for they hold the memories, culture, tradition and hopes of Aboriginal and Torres Strait Islander people that contribute to our community.