Building our City

Find out what current and planned works are happening in and around our city.

Updated: Thursday, 12 March 2026

Construction

  • Animal care centre - Education Hub – Construction complete. Occupational Certificate to be finalised.
  • Lavington Drainage Reconstruction – Progressing with retaining wall works along section between Boronia Street and Tamarind Street.
  • Waterview Aeration and Diffuser Cleaning – RCE Australia Pty Ltd has successfully completed the scope of works for all four aeration tanks.
  • Thurgoona Link Road (Stage 5) / Kerr Road Sewer – Underboring now complete, road crossing and cut into existing sewer planned this week.
  • Thurgoona Link Road (Stage 5) and Water Trunk Main – Construction beginning once sewer construction is complete.
  • Australia Park Carpark and Levee Construction – Concrete works for the retaining wall and construction of the earthen levee are continuing. Driven piles for the pedestrian bridge foundation have been installed with reinforcement installation to follow.
  • Airport - Taxiway Alpha – All night works complete, currently laying asphalt with works planned to be completed before Easter.
  • Renewal of sewer infrastructure at SPS37 Jelbart Road – Relining of pipelines and preparation for manholes in progress.
  • Sewer Pump Station 22 – Rising main cut in complete, pits lowered into place and pressure test underway.
  • WR03 embankment stabilisation – Rock bolting, slope regrading, meshing, sub-horizontal drains and crest drainage has all been installed and completed. Toe drainage in progress.
  • Burrows Road Reconstruction – Finalising laying of watermain, construction of road pavement to commence (refer to photo).
  • Eastern Hill Tower Upgrade – Communications pole assessed and is in good condition, design works underway.
  • Sewer Interconnection Elizabeth Mitchell Corry's Road Intersection – Works to commence this month.

Design

  • Animal Care Centre Redevelopment - Stage 2 - Design 95% complete.
  • Albury Airport – Runaway Overlay Design – Preliminary design in progress.
  • Albury Airport - Aeromedical emergency support apron – Detailed design in progress.
  • Functional Design and MCA for wet weather storages – Tenders received.  Assessment in progress.
  • Kremur St aeration platforms upgrade – Design – Tenders received. Assessment in progress.
  • South Albury Levee Upgrade - Design review in progress.
  • Logan Road Culvert Replacement – RFT for Concept Design and Options Analysis out to market, with submissions due in March.
  • Waste Management Centre – Northern and Southern Valley Cells - RFT for design for both landfill precincts in progress.
  • Dean Street Bridge Renewal – Structural design and documentation in progress.
  • Maryvale Raw Water Cross Connection - Environmental and Aboriginal Cultural Heritage Due Diligence Assessments completed. Design and RFT in progress.

    .

    Subscribe to City Development updates

    * indicates required
    OUR
    ACKNOWLEDGMENT

    AlburyCity acknowledges the Wiradjuri people as the traditional custodians of the land in which we live and work and we pay our respects to Elders past, present and future for they hold the memories, culture, tradition and hopes of Aboriginal and Torres Strait Islander people that contribute to our community.